The evaporative circulating water, water pipelines, evaporation area pipe network, and domestic sewage treatment facilities constructed by Guiyang Aluminium Project of Zunyi are under the careful organization of the project department. The construction progresses smoothly and the project quality is good.
In this year's construction project, the evaporative recirculating water system consists of a pump room, two hot water pools, two cold water pools, a water treatment room, two cooling towers, and a corresponding transformer room and control room. The construction process is complicated and difficult. . In order to ensure the construction quality, the project department staff strictly observe the site. At present, two hot water pools, pits, high-voltage distribution room foundations and hot pool wall concrete have been completed. The water supply pipelines have gone through arduous efforts and 360 pipelines have been rusted and painted to complete 400 meters of installation. The steel structure of the evaporation area pipe network was completed 80%, and the installation of the bracket was completed by 10%. The civil construction, water supply and drainage of domestic sewage treatment facilities have been completed, and equipment and electrical installations have been completed. The conditions for completion of the work will be available next month.
Nozzle Flowmeter,Nozzle Flow Meter,Nozzle Flow Meter Equipment,Nozzle Type Flow Meter
Jingsu Huaerwei Science and Technology Group Co.,Ltd , https://www.huaerweiflewmeter.com