10 small details of bathroom tile

Introduction: Because the moisture in the bathroom is the heaviest, it is the most important thing for decorating. In order to avoid the hollowing and falling of the tiles, clean the wall and the brick surface. The wall must be inspected before tiling. If the wall has cracks, it must be treated first.

10 small details of bathroom tile

Due to the special humid environment in the bathroom, special care is required in the decoration and routine maintenance. The small details of the 10 bathroom tiles provide a refreshing and clean bathroom space.

1. Choose high quality tiles

Due to the heavy humidity in the bathroom, choose tiles that are non-slip, damp-proof, dirt-resistant, and low-absorbency.

2. Tile arrangement before tile laying

Paving bricks before making a plan, try not to appear less than a third of the narrow columns. If it is to be processed and cut, it is advisable for the ceramic tile to be cut after leaving more than two-thirds.

3. Clean tiles and walls before paving

In order to avoid emptying and falling off of the tiles, clean the walls and the brick surface. The wall must be inspected before tiling. If the wall has cracks, it must be treated first.

4. Reserve expansion joints

Tiles will expand when exposed to heat and moisture, and may squeezing. This will cause empty drums to fall off, so be sure to leave the tiles in the bathroom.

5 waterproof before laying

Leveling and drying can be done only after waterproof construction. Pay attention to fire prevention and waterproof during construction. Before doing waterproofing, the correct leveling of the bathroom should be checked, and it is especially necessary to pay attention to the correct position of the floor drain.

6 first tile and then install the toilet

Benefits of the post-installed toilet: On the one hand, it can prevent water leakage from the toilet and affect tile construction; on the other hand, it can prevent damage to the toilet when paving tiles.

7. Stitching should be done after the tiles are completely dried

After the tiles are tiled for 24 hours, they should be jointed again to avoid loosening or falling off due to incomplete drying of the tiles.

8. Note the wall punching strength

It is best to spray the water at the same time for the cooling treatment to prevent the tiles from bursting due to the local short-term dramatic temperature changes.

9. Decontamination paste + waterproof agent = impermeable

First use a multi-functional decontamination paste to remove the dirt from the gaps in the tile, and then use a brush to repel the water repellent to achieve the effect of seepage and mildew prevention.

10. The daily cleaning of bathroom tiles should be timely

Oxalic acid solution or vitamin C can remove rust stains on tiles; scrub gently with ** to remove soap stains.