Concrete surface control→first stage material spreading construction→smoothing→light collection→conservation→cutting and filling.
The concrete foundation leveling layer requires a thickness of 30mm-50mmM or more, a strength of C25 or more, a minimum cementitious material content, a slump of 75-100mm in the field, and the surface of the concrete should be dense, smooth, and free from bleeding.
When the initial setting of the concrete was performed with a finger pressure test, a 3-5 MM print was left and the construction could begin.
Hand-scraped ground-hardening materials can be used to compact and collect light by absorbing moisture from the concrete and getting it wet.
Use a hand spatula to close the mechanical construction area.
Avoid splashing water on the surface during construction.
After the surface is finished, use a special curing agent and spray it with a spray of fine spray. Do not cover it with plastic sheeting.
Cutting expansion joints.
Use a sealer.
Sealing coating: In some cases, there is a high requirement for aesthetics and chemical resistance. At this time, it is recommended to cover one layer with CE01.
The concrete foundation leveling layer requires a thickness of 30mm-50mmM or more, a strength of C25 or more, a minimum cementitious material content, a slump of 75-100mm in the field, and the surface of the concrete should be dense, smooth, and free from bleeding.
When the initial setting of the concrete was performed with a finger pressure test, a 3-5 MM print was left and the construction could begin.
Hand-scraped ground-hardening materials can be used to compact and collect light by absorbing moisture from the concrete and getting it wet.
Use a hand spatula to close the mechanical construction area.
Avoid splashing water on the surface during construction.
After the surface is finished, use a special curing agent and spray it with a spray of fine spray. Do not cover it with plastic sheeting.
Cutting expansion joints.
Use a sealer.
Sealing coating: In some cases, there is a high requirement for aesthetics and chemical resistance. At this time, it is recommended to cover one layer with CE01.