Tile paving is a big project in our home project. Good paving techniques make the home look more beautiful and atmospheric. If the paving technology is not perfect, it may cause the phenomenon of tile shedding and also affect the service life of the entire ground. Therefore, we must pay attention to the method of laying bricks in the home improvement process. Then Xiao Qi introduced the method of laying bricks for everyone and hoped to help everyone.
Tile laying method
First, the tiles should be fully immersed
In the tile floor before the first choice to clean tiles clean, and then fully immersed, at least in more than 2 hours. Why do you want to soak it? Because there are small holes in the tile, if it is enough to absorb enough water, it will not cause the adhesive water, lack of firmness, causing the tile hollowing, falling off phenomenon. Prepare the tiles and remove them from the water before drying.
Second, choose high quality cement sand
The quality of floor tiles is closely related to the quality of cement sand. The selection of high-quality cement sand allows the floor tiles to be firmly bonded together with the ground. Look at the cement to see whether it has achieved QS certification; sand is the best choice for river sand, and the effect of paste will be better.
Third, set up the auxiliary line before paving
At this time, we must first suspend the vertical line on the wall leveling layer, and then calculate the size line of the floor tile. The horizontal line thus set can ensure that the tile can be laid horizontally and vertically.
Fourth, set up support boards.
Because the tiles are horizontally laid, the purpose of this is to make the tiles that can support the tiles, and not to let the tiles fall before they reach the adhesion strength.
Fifth, from top to bottom of the paving order.
The laying order of the tiles is regular, generally starting from the edge of the door (or balcony), the order is from top to bottom, from left to right. The specific method is to find the leveling layer first, then apply the adhesive on the opposite side of the tile with a spatula, and then put the tile on the ground. At this time, you need to tap the tile to make the mortar better bonded to the tile. Note: The sticky material is best at the very best, if it is too thick, it is not easy to spread, but too thin and sticky.
Six, the last maintenance
After the tiles are laid according to the above method, the stains and dust must be treated in time. If there are some hard-to-remove stains on the surface, ordinary cleaning is not possible. At this time, you can wipe it with 10% dilute hydrochloric acid solution. Tips: If you use dilute hydrochloric acid, be sure to rinse it again with tap water. After the final floor tile is cleaned up, you can apply a thin layer of brightener, wipe it with a rag, and you're done.
Editor's summary: The above introduced the method of laying bricks for everyone, and I hope that everyone will have a better understanding of floor tiles. Finally, remind friends and other floor tiles to be posted, be sure to clean up the stains in time, if the stain is hard and then deal with very hard, and will bring damage to the floor tiles oh.
Tile laying method
The Railways specialist business unit covers every stage of the process, from feasibility studies and design, through to construction, works supervision and maintenance. It offers innovative solutions and advanced materials adapted to each project, integrating construction processes and sustainable best practices. It offers proprietary technology for laying ballastless track for high-speed lines and tramways.
Subway Tunnel Trolley,Railway Tunnel Trolley,Railway Tunnel Lining Formwork,Railroad Formwork
Anshan Lijian Engineering Group Co. LTD , https://www.lijianformwork.com