Rainy season construction measures for sump arched cover

1. According to the situation of the project site, determine the drainage direction. The site drainage should be ensured at all times and dredged regularly to prevent backwater from flowing back. 1. According to the situation of the project site, determine the drainage direction. The site drainage should be ensured at all times and dredged regularly to prevent backwater from flowing back.
Sewage pool cover 2, construction materials and materials that are afraid of moisture, semi-finished products stacked 20cm above the ground, surrounded by drainage ditch, the top should be covered, carefully prevent rain and moisture, prevent material deterioration.
3, repair the road, paving gravel or slag crushing and smoothing, on both sides of the road, the drainage around the building.
4, on-site electromechanical "target=_blank> mechanical and electrical equipment must have reliable rain and moisture and grounding zero device to ensure its normal operation.
5. After the rain, the construction quality of the construction, scaffolding and equipment will be thoroughly inspected, and the problems will be repaired in time.
6. Pay attention to the weather conditions during the construction period, comprehensively consider and arrange the construction reasonably, and do a good job in the technical delivery of workers. Prepare for rain protection when you are off work, prevent rainwater from rushing, and strictly guarantee the quality of construction.
Sewage treatment engineering biological deodorization construction site organization setting 1, construction organization management structure mode The project is a large-scale, complex construction project, which requires multi-sector, multi-technology, multi-work type construction, in different construction stages, for different personnel Different quantity and matching requirements, therefore, the project management organization form adopts matrix construction organization management structure mode.
2. Construction organization The project is planned to be managed according to the project law. Based on the principle of “scientific organization, creating excellent cups, safe and efficient, ensuring construction period and civilized construction”, we organize similar construction experience and familiarity with the construction conditions in the area. Construction management personnel set up the project department. According to the characteristics of the project and the requirements of the construction, the management personnel who undertake the construction tasks of the project shall be composed of engineering and technical personnel and management personnel with similar construction experience.
China Hardware Business Network
Http://news.chinawj.com.cn Rainy season construction measures for sump arched cover Editor: (Hardware Business Network Information Center) http://news.chinawj.com.cn Rainy season construction measures for sump arched cover

Sanding Disc Backing Pad

Excellent balance: the balance is important when polishing. The reinforced inner structure keeps the plate stable and smooth. High-quality material and advanced production technology ensure the pad balance.Resistance to heat, and reducing heat transfer to the paint surface.The better balanced a backing pad is, the less fatigue you feel when polishing or waxing car.The Velcro backing has extra gripping power and it is strong.works well and has not shown any sign of wear after about 50 hours of use.Backing pads are Widely used in grinding and polishing artificial stone, furniture and wood products, metals, cars and other items.

Sanding Pad01 Jpg

22 6 Jpg

High Flexible durability, This Roloc disc back holder is made of reinforced rubber material, longer life time than other products.Widely used with various types of discs, Mini flap discs, quick change discs, Surface Conditioning Discs, strip discs and Roloc bristle discs etc.The 1/4 shank fits drills, air powered die grinders, and other Power Tools and air tools.Max speed of 30000RPM, full range size of 1in 1.5inch 2in 3inch are available.


We distributes and wholesales various brands of Bonded Abrasives , Abrasive Sanding Disc, Cutting Wheels , Flap Wheels , Flap Disc Backing Pad , Flap Disc Adhesive , and Surface Conditioning Product etc, and enjoy a high position among consumers.

Sanding Pad58 Jpg20200512101021 JpgSanding Pad23 Jpg20200217144313 JpgSanding Pad44 Jpg



Sanding Disc Backing Pad,Hook And Loop Pad,Disc Pad Holder,Sander Replacement Pad,grinder backing plate

Zhengzhou Jiading Abrasive Manufacturing Co.,Ltd , https://www.jiadingabrasive.com