Due to the late return from the construction site on these two days, the finishing work was complicated and did not report back in time. I hope everyone will forgive me. Closer to home, this article describes the transformation of the water circuit of the family.
It is often said that: At the beginning of the renovation, hydropower is first, because the hydropower project is an important and key task in home renovation, and it is a hidden project. For this project to be foolproof, I specifically took a week off, full supervision, and facts proved unnecessary. Because the local plumbers are comfortable with the rest of the world, the hydropower reforms are very satisfying.
The hydroelectric reform brothers are from Hunan. They are tall and short, everything is a little cut, they wear a cloth, and the cooperation is even tacit. Moreover, after understanding the exact needs of the cricket, the construction plan was immediately proposed.俺Approved immediately after implementation. Due to the large amount of work done by the family, especially the circuit, network, and cable changes, the two brothers took a full 5 hours to complete the renovation work. On the fifth day of the eve, the water pressure test was conducted. Once qualified, the total cost was 3K. After a comparison, I feel good and feel better than a professional remodeling company. But at the price, whoever is cheaper steals it, huh, huh.
friendly reminder:
1, according to the needs of their own life, combined with the placement of furniture, a reasonable layout of the circuit and the waterway, in order to facilitate the practical;
2. Understand the way of accessing the community network in advance, and rationally arrange the location of the network and the telephone to avoid unnecessary construction waste. (Because the previous investigation was not enough, the home network and telephone were changed to more locations, and the line was changed longer, as to whether it was practical. Need to test in the future, it is estimated that a lot of waste, huh, huh); In addition, the network cable and the phone panel combined to save a little Mi Mi.
3. Residential air conditioning outlets are preset on the outer wall of the air conditioner. After the air conditioner is installed, the air conditioning wires and pipelines form a “dump†effect, affecting the appearance, and consideration should be given to moving the outlet to the outlet hole side.
4, Yuba Changan near the bathing area above, not the middle of the bathroom, and for the convenience of adjustment, Yuba control switch should be installed in the bathroom instead of the door, if the bathroom lighting directly used for bathroom lighting, should be lighting After the switch is separated, it is placed outside the bathroom door. The method of putting it in place is to separate the bathroom fan switch and place it near the toilet, so that it can be opened in time when it is convenient for BB so as to avoid self-residue fainting.
5, a few lamp lines are well reserved: mirror headlights, cabinet countertop operating lights, hood operating lights (such as billion-generation need to be equipped with), cloakroom lighting, etc.;
6, according to the community structure, the kitchen does not need waterway transformation, the transformation of the bathroom waterway is not much (a lot of saving Mi Mimi!), it is recommended to try not to damage the ground, if the waterway to cross the wall as far as possible from the upper tube, one insurance [water Underwater submarine neighbors are to accompany (losing money, alms, compensation is not)], and second, even if the leak is easy to find early, easy to handle, but the ground should be done both waterproof and closed water test.
7. All the water circuit pipelines, especially the modified circuit drawing, photographing and surveying, shall be recorded and kept in good detail after all transformations are completed, to avoid hitting the pipeline during the later installation (not the electric shock or the running water). Secondly, in the event of a problem, it is convenient for timely and accurate overhaul and reduce the amount of construction.
It is often said that: At the beginning of the renovation, hydropower is first, because the hydropower project is an important and key task in home renovation, and it is a hidden project. For this project to be foolproof, I specifically took a week off, full supervision, and facts proved unnecessary. Because the local plumbers are comfortable with the rest of the world, the hydropower reforms are very satisfying.
The hydroelectric reform brothers are from Hunan. They are tall and short, everything is a little cut, they wear a cloth, and the cooperation is even tacit. Moreover, after understanding the exact needs of the cricket, the construction plan was immediately proposed.俺Approved immediately after implementation. Due to the large amount of work done by the family, especially the circuit, network, and cable changes, the two brothers took a full 5 hours to complete the renovation work. On the fifth day of the eve, the water pressure test was conducted. Once qualified, the total cost was 3K. After a comparison, I feel good and feel better than a professional remodeling company. But at the price, whoever is cheaper steals it, huh, huh.
friendly reminder:
1, according to the needs of their own life, combined with the placement of furniture, a reasonable layout of the circuit and the waterway, in order to facilitate the practical;
2. Understand the way of accessing the community network in advance, and rationally arrange the location of the network and the telephone to avoid unnecessary construction waste. (Because the previous investigation was not enough, the home network and telephone were changed to more locations, and the line was changed longer, as to whether it was practical. Need to test in the future, it is estimated that a lot of waste, huh, huh); In addition, the network cable and the phone panel combined to save a little Mi Mi.
3. Residential air conditioning outlets are preset on the outer wall of the air conditioner. After the air conditioner is installed, the air conditioning wires and pipelines form a “dump†effect, affecting the appearance, and consideration should be given to moving the outlet to the outlet hole side.
4, Yuba Changan near the bathing area above, not the middle of the bathroom, and for the convenience of adjustment, Yuba control switch should be installed in the bathroom instead of the door, if the bathroom lighting directly used for bathroom lighting, should be lighting After the switch is separated, it is placed outside the bathroom door. The method of putting it in place is to separate the bathroom fan switch and place it near the toilet, so that it can be opened in time when it is convenient for BB so as to avoid self-residue fainting.
5, a few lamp lines are well reserved: mirror headlights, cabinet countertop operating lights, hood operating lights (such as billion-generation need to be equipped with), cloakroom lighting, etc.;
6, according to the community structure, the kitchen does not need waterway transformation, the transformation of the bathroom waterway is not much (a lot of saving Mi Mimi!), it is recommended to try not to damage the ground, if the waterway to cross the wall as far as possible from the upper tube, one insurance [water Underwater submarine neighbors are to accompany (losing money, alms, compensation is not)], and second, even if the leak is easy to find early, easy to handle, but the ground should be done both waterproof and closed water test.
7. All the water circuit pipelines, especially the modified circuit drawing, photographing and surveying, shall be recorded and kept in good detail after all transformations are completed, to avoid hitting the pipeline during the later installation (not the electric shock or the running water). Secondly, in the event of a problem, it is convenient for timely and accurate overhaul and reduce the amount of construction.
Hydroelectric retrofit experience lighting switch socket arrangement toilet mirror front lamp counter cabinet door kitchen cabinet door bathroom waterproof toilet waterproof price bathroom door bathroom leaking home decoration decoration home