How to schedule? The most detailed renovation period guide

How many days of renovation work do you have? Which process is every day? Each decoration owner should have a timetable with the decorating company in order to understand the progress of the renovation and the time required for supervision and acceptance. Many decorators do not understand the schedule. This article explains how the usual schedule is.

Schedule Example 1

The following is a brief case schedule:

March 16-23:

1, toilets, bathroom wall tiles finished;

2, furniture paint to do a good job

3, window stone paving

4, the wall putty again

April 23-May 15:

1, April 23, batch wall putty two times

2, April 25, batches of wall putty three times

3, April 30, polished, install the kitchen sliding door

4, May 1, brush the wall paint

5, May 3, shop balcony and living room floor tiles

6, May 8, wall paint

7, May 10, brush wall paint

8, May 11, install the kitchen cabinet

9, May 12, install the room floor

10, May 13, doing health

May 15, Acceptance of Housing

This time schedule is relatively sketchy, and detailed construction schedules also include each construction project, construction time, and personnel. The purpose of the foreman providing the schedule to the owner is to let the owner understand the basic schedule of the construction period, such as the completion of the water circuit reform, the sealing of the woodware, the paste of the tiles, the production of the ceiling keel, etc. . In this way, the owner can make reasonable arrangements for his own time and regularly check the quality at the scene when important steps are taken. If the foreman does not initiatively provide the owner with a timetable before the start of work, the owner must obtain the time sheet from the owner himself. Otherwise, if the time limit for the construction period is delayed or the important part fails to be accepted in time, the owner can only think that he is unlucky.

Schedule Example 2

Decoration materials knowledge decoration construction knowledge building materials knowledge

1 234 Next> Total 4 Pages
Page to page
Function assignPage() { var page = $('#page_val').val(); if (/_\d+\.html$/.test(location.href)) { location.href = location.href.replace( /_\d+\.html/, ((page == 1) && 1? '' : '_' + page) + '.html') } else if(/\/\d+\.html$/.test (location.href)) { location.href = location.href.replace(/(\d+)\.html/, ((page == 1) && 1? '$1' :'$1_' + page) + ' .html') } } $(function(){ $('#page_form').submit(function() { assignPage() return false; }) $('#page_btn').click(function(){ assignPage( ); return false; }) }) See full story

Kitchen Sink Strainer

Kitchen sink strainers are used to prevent food, waste, scraps from running down the drain and clogging kitchen pipes; Use the Stopper to fill the sink with water for washing and soaking. Our products are designed to be simple and unobstructed to match any style of sinks. And they are made of high-quality stainless steel, durable, not easily deformed, and easy to clean.

Kitchen Sink Strainer,Cabinet Shelves,Basket Strainer,Sink Strainer Basket

JIANGMEN MEIAO KITCHEN AND BATH CO.,LTD , https://www.meiaogroup.com