Reveal 10 hidden dangers in the hidden project decoration process

As the saying goes, the insiders are looking at the door and the amateurs are watching. However, what exactly do we look at in the decoration scene and how do we look at it to achieve a multiplier effect?
View one: waterproof engineering

For covert waterproof works, the most important thing is to do meticulous construction. First of all, before the renovation, the construction personnel must do a 24- hour water-retaining test. After confirming that there is no leakage, clean up the ground debris, remove the loose parts, and then use a cement mortar to smooth the uneven areas, and then the entire Flattened on the large surface. Closed water test can also play a role in distinguishing and determining the responsibility of the waterproofing project. There is a leakage phenomenon responsible for the developer; there is no leakage after the renovation and there is leakage, the responsibility is in the decoration company.
If the bathroom is waterproof, the water will splash on the adjacent wall when bathing. If there is no protection of the waterproof layer, the partition wall and the diagonal wall of the corner will become mildewed, so be sure to prepare the wall surface before laying the wall tiles. Waterproofing, in general, the walls are to be treated with a waterproof height of 30 centimeters, but the non-load-bearing lightweight walls should be waterproofed at least to 1.8 meters high. Special attention should be paid to the corners and strictly prevent the occurrence of drip leaks. In fact, most of the waterproof layer leaks are corners. Therefore, if these places are properly prepared, the possibility of leakage will be reduced.
View 2: wall and keel

If the wall and the keel violate the rules of operation, they will not be easily found. For example, due to the collapse of the ceiling in whole or in part, the ceiling becomes a “ top drop ” .
View three: suspended ceiling ( l; h% j* j
The combination of the ceiling and the floor and the keel and the veneer is not good, or the load is too large, which can easily cause a " falling top " . According to the regulations, the ceiling keel shall not be twisted or deformed. The installed keel shall be firm and reliable. The horizontal deviation shall not exceed 5 mm; a chandelier or ceiling fan exceeding 3 kg in weight shall not be hung on the ceiling keel, but shall be separately provided. If the ceiling plasterboard using the decorative panel thickness should be about 9 mm.
View 4: Fragment
1 , hot and cold water pipes mixed
White is a cold water pipe, red is a hot water pipe, and a cold water pipe and a hot water pipe are mixed together. There is a hidden trouble: the expansion and contraction rates of hot and cold water pipes are different, and the cold water pipes burst and leak due to thermal expansion and contraction. According to the color to distinguish hot and cold water pipes, strict operation.
2 , using 107 glue Lyrics Home +?: M,
There are hidden dangers in the use of 107 glue in the decoration : As the 107 glue contained serious toxic substances such as formaldehyde and benzene, the state has banned it. Standard operation: Currently, there is no natural and non-polluting glue on the market. The substitute is 108 glue. However, we must look for better brands and look for products with test reports.
3 , wire does not have insulation tube real estate forum , decoration forum , owners forum 7 C. {& U& `9 y
During construction, the wires are buried directly in the wall, and the wires are not covered with insulating tubes. The wires are connected with hidden dangers: this is very unsafe, and the wires may be short-circuited due to some reasons, such as the aging of the wires, when they are staying; Once the wire is broken, it cannot be changed at all. Only the wall knocks on the ground. The standard operation is to lay the insulation sleeve on the outside of the wire. At the same time, the circuit connector should not be exposed outside. It should be installed in the online box. No joints are allowed between.
4. Freely change the waterway
In the case that the owner does not understand the decoration, misleading the owners to arbitrarily demolish the hidden dangers: the waste of money is only one aspect, once the seal is not sealed or lack of pressure test, it will lead to water pipe burst. Standard operation: when the pipeline is modified If you do not move, you must not move.
5. Strong and weak electricity are placed together
Typical jerry cuts. The ferroelectric? Wire illumination? And weak? Such as telephone lines, network lines? Placed in a box or tube, a pipe laying less, saving time and effort. There are hidden dangers: There will be interference when making a call or surfing the Internet. At the same time, too much threading in a pipe also creates a risk of fire. Normative operation: Strong and weak electricity should be routed separately. It is forbidden to share one pipe and one bottom box for strong and weak electricity.
6. The length is not enough without connection Accessories
Because the length of the insulating tube is not enough, there is exactly a turn here, no connection fitting is placed, and a section is exposed at the intersection with the junction box. There are hidden dangers: If you stay for a long time, it may cause leakage due to the aging of the line. Normal operation: There should be something connected between the nozzle and the junction box.
7. Repeated wiring
A large number of repeated wiring, multi-use materials, waste the owner's financial and material resources. There are hidden dangers: once line problems, difficult to detect in like a "dragnet" layout. Normative operations: Arranged closely, in the case of no more than 40% of the capacity of the pipe , the same trending line can be worn in a pipe. However, it is necessary to separate strong and weak electricity.
8. The line pipe was damaged by the follow-up project 3]# I, C* O: t
Typical barbaric construction. After the pipeline was laid, it was slotted on the ground again and the pipeline was laid through. There are hidden dangers: After you check in, you may find that there is no electricity in a room in your home. You can only detect and re-thread all the wires in your home. Normative operation: The construction cannot be performed again in the place where the pipeline is laid. If it is damaged, it is forbidden to wire in the middle when changing lines. When the circuit load is large, the joint of the wire in the threading pipe is easily sparked and a fire occurs.
9. putty when cement
Typical shoddy. On many construction sites, the mistakes of the construction team were well-known, and the horizontal slotting did not say that after the wiring of the line pipe was completed, the putty powder was used as cement. There are hidden dangers: The horizontal slotting during the decoration has destroyed the bearing weight of the entire building, and the original design's ability to resist earthquakes has decreased. Normative operation: The cement used to plug the trunk must be consistent with the cement of the original structure to ensure its strength.
10. Wires are not separated
All lines use a single color, for the sake of labor. There are hidden dangers: once the line is in trouble, the line of discordance is detected again. Normative operation: The bottom box wire wraps are wrapped with different signs. FireWire uses red wire and red wrap cloth, and the zero wire is blue, green and black, and it is wrapped with a wrapper cloth of the same color. The ground wire applies yellow, green and blue wires. 【

Entrance decoration Restaurant decoration Cement lighting Decoration design Room Formaldehyde Decoration Find Decoration Company Okay Ceiling Fan Lights Bathroom Tiles Bathroom Doors Bathroom Tiles Color Bathroom Ceiling Material Bathroom Ceiling Overall Bathroom Toilet Design Bathroom Waterproof Bathroom Leaking Tiles

spline roller

spline roller,Window Screen Spline Roller Tool,Window Screen Rolling Tools,Screens Spline Rollers

Jinwu Glass Fiber Co., Ltd , https://www.jwglassfiber.com