If you are decorating Xiaobai, it may make you dizzy for the first time to decorate the house. It does n’t matter. Here are the old drivers who will show you the steps to decorate the house with the standard version. What are you waiting for, let ’s take a look.
To be honest, if you are not a professional in interior design and architecture, decoration should be super strange to you.
Do n’t blindly start construction when you have n’t figured out the decoration steps, because you may encounter workers who are also not working.

This is what my relatives did. They didn't understand anything. They found guerrillas and messed up the house. In the end, many projects needed to be reworked. It sounded miserable.
The preliminary preparation is more convenient for the new house rough house, because most of the design of the commercial house today does not need to be changed.
The second-hand house is different. During the renovation, there will be an additional demolition project. This project includes the modification of the room type and the wall.
The next step is heavy:
Steps to decorate the house with the standard version

Did you see this picture at a glance? Yes, the decoration is actually so simple, why bother bothering you!
Nevertheless, the old driver still needs an in-depth explanation:
------- Pre-design
It is no exaggeration to say that the design link in the early stage was the "soul" of home improvement.
Everyone must fully communicate with the designer, what style and color you want, this stage will also determine the appearance of your new home.
At this stage, the designer will make a comprehensive and detailed measurement of the living room, including the area involved in the decoration process: such as the area of ​​the tile, the wall paint area, the wallpaper area, the floor area, etc.
------- Main body dismantling
Entering the construction stage, the main demolition is the first project to be carried out, mainly including demolition of walls, masonry walls, shoveling wall skins, etc. To understand it simply, this stage is to build the construction site first.
------- Hydropower Transformation
After hydropower positioning, the next step is to make a slot. The groove made by a professional master is basically a straight line, and there are basically no hair teeth on the edge of the groove. Before grooving, be sure to ask the hydroelectrician to mark all hydropower directions on the wall, and remember to check the hydropower diagrams to see if they are consistent.

When signing a contract, it is best to indicate the materials used for waterway reconstruction. In addition, pay attention to the size of the sewer pipes in the original room during the waterway reconstruction. The pipes of the external sewer pipes should be matched with the original sewer pipes.
In the circuit transformation, pay attention to carefully consider where the lamps and electrical appliances are installed in the room in order to determine the location and number of switch sockets.
Hydropower acceptance is an important node, and it is necessary to check whether the circuit load and socket arrangement are consistent with the drawing design. The water pipe crushing test shall be accepted in accordance with national standards.
------- Carpentry
Woodworkers, bricklayers, and painters are the "three brothers" in the construction process. The basic order of appearance is: wood-tile-oil.
After the hydropower transformation is completed, carpentry enters the field. Pay attention to the following:
When you get the designer's drawings, it is best to review the dimensions carefully before signing.

Before the carpenter enters the field, the board is in the advanced field, and carefully check whether the board that enters the field is in accordance with the contract and whether it is genuine. Like hydropower, carpentry is the main source of profit for the decoration team, but also the main source of formaldehyde in the decoration. To control this, in addition to the board meeting the national environmental protection regulations, the wood lacquer used must also be selected.
------- Tiling
If the workers are too busy to work, usually the bricklayers will be able to put in tiles before the carpentry is over. There is no conflict between the two. In the process of bricklayer operation, the following aspects need to pay attention to these important points:
Installation of door sills and marble windowsills. The installation of the gate stone can be done together with the floor tiles or after the floor tiles. The installation of the marble window sill is generally done after the window cover is completed, and the worker who installs the marble will prepare the glass glue, and then the marble and the window cover are sealed with the glass glue.

Floor drain installation. The floor drain is the first of the home improvement hardware, because it must be installed together with the floor tiles. Although the floor drain is small and cannot be underestimated, everyone should choose carefully.
An important node in the bricklayer stage is the acceptance of waterproofing with a 24-hour "storage test".
After the bricklayer is finished, to be precise, after the kitchen wall and floor tiles are finished, you can ask the cabinet for the second measurement.
------- Painting
The painter enters the site mainly to complete the wall surface treatment, paint the topcoat, and paint the furniture.
Students who are going to put on wallpaper, tell the painter that they only need to do basic treatment on the wall where they plan to put wallpaper. If the gypsum line is installed, it is also installed at this time.

After the painter finishes, maybe some students will feel that the decoration is coming to an end, but in fact it is not. Because everyone generally understands that the decoration is only the "construction link" of decoration, in fact, the "installation link" of decoration is also the focus of decoration.
------- Water heater installation
The water heater can be notified of delivery and installation after the wall and floor are completely decorated.
The water heater is generally installed before the ceiling. Gas water heaters are generally installed in the kitchen or closed balcony, and electric water heaters are installed in the bathroom.
------- Kitchen and ceiling
After the water heater is installed, the next step is the ceiling. At the same time as the kitchen and bathroom ceilings, the kitchen and bathroom ceiling lights and exhaust fans (bathroom heaters) should have been bought. Generally, the kitchen and bathroom ceiling lights and exhaust fans are installed at the same time.

------- Cabinet installation
After the ceiling is over, the cabinet can be installed on the door. At the same time, there is also a sink installed (may not include the upper and lower water parts)
------- Installation of cooker hood
If the time permits, it is best to install the cooker hood and the cabinet installation on the same day to facilitate the coordination of the masters of both sides.
------- Wooden door installation
In order to make the construction period closely connected, it is necessary to let the wooden door manufacturer come to the door and measure the size of the door hole as soon as possible after the main body is disassembled and modified. The production cycle of solid wood doors is generally one month. Hinges, door locks, and floor suctions to be installed while installing the door.
Regarding the installation order of the floor and wooden doors, there is no uniform standard, and the workers can construct according to the specifications.
------- Floor installation
Floor installation needs to pay attention to the following issues:
Before installing the floor, it is best to let the manufacturer come to the site to investigate whether the ground needs to be leveled or partially leveled. The floor of the paved floor at home should be cleaned, and the ground should be kept dry, so do not use water during the cleaning process.

After the floor is installed, it is best to provide ground protection to prevent damage or contamination of the floor by subsequent procedures.
------- Paving wallpaper
After the installation of the floor is complete, you can make an appointment on the wallpaper. Before laying wallpaper, keep the ground and walls as clean as possible, and keep them free of dust. In general, wallpaper laying can be completed within one day.
------- Install switch socket
In the bathroom, all sockets and switches must be waterproof, and sockets must be covered. And it is recommended that the switch at the entrance is preferably inductive or fluorescent, so that it is convenient to use in the dark.
There are more and more switches and sockets, and there are more and more general household appliances. Once new appliances are available, it is difficult to install sockets. If the socket is not enough, you can only use the wiring board, which may affect the appearance. Therefore, you should consider it in the initial design.
------- Lamp installation
The lamps can be installed by electricians in the decoration company. Many lamps on a treasure now have their own installers. After receiving the goods, you can confirm the door-to-door time with the workers.
------- Hardware installation
At this stage, the bathroom pendants, toilets, bathroom cabinets, etc. purchased earlier are all installed together. After these outfits are installed, you really feel at home.
------- Curtain installation
The installation of curtains marked the end of home improvement. The busy dimly decorated days can finally be over.

------- Furniture entry
Regarding the purchase time of furniture, the earliest is after the completion of the renovation of the water circuit. In this way, we only know the basic size range of the furniture.
------- Home Appliances
Home appliances such as washing machines, televisions, refrigerators, and air conditioners are installed. Finally, after cleaning, a beautiful new home was completed. Is it very fulfilling?
Summary: In this way, decoration is not a particularly remarkable event. After understanding the steps to decorate the house, the next step is the methodical construction stage. I wish you all a perfect decoration process.
What, the decoration still uses his own money? ! The Qi family is decorated in installments, with an ultra-low annual interest rate of 3.55% and a maximum loan of 1 million. Apply now to enjoy the discount
House decoration process
Safety harness accessories are thoes stuff which are widely used with safety harness.Such like fall-protection lanyard,carabiners,elastic ropes,buckles,etc.
Lanyard is quite popular equipment,it has various types by different End Fittings.
Carabiners is a connection link which is usually made by steel or high strength aliminum.
They are not the main parts of safety harness,however a safety harness only has more functions with its suitable accessories.
Aluminum Safety Harness Accessories,Carabiner Safety Harness Accessories,Steel Safety Harness Accessories
WINNERLIFTING SAFETY EQUIPMENT CO.,LTD. , https://www.winnerlifting.com